Civic Issues
Topics getting the most attention in Urbandale public meetings, ranked by how frequently they are discussed.
18 issues in roads
Douglas Avenue parking and three-lane corridor operations
Councilmember Cacciatore raised concerns that drivers don't realize Douglas Avenue narrows from four lanes to three, ending up in turn lanes and making sudden maneuvers. He asked staff to start a dialogue on better signage.
Urbandale-Clive on-demand transit zone
A ribbon cutting celebrated the launch of the Urbandale-Clive on-demand ride zone, letting Urbandale riders get picked up near home and dropped off within the zone or at Synergy/Sidney Hall. Ridership is expected to build slowly.
Loss of dirt buffer along 170th Street near Waterford Villas
A resident asked the city to stop removing the hill that blocks sight and sound from 170th Street for 21 homes, and to meet with homeowners on alternatives.
2026 Construction Program Update
Council awarded four contracts at bids well under estimates: concrete patching near Parkview Drive, the Northwest Urbandale Drive preservation project, ADA ramps citywide, and sidewalk repairs mostly in northeast Urbandale.
New school stop on 153rd Street
Updated walk boundaries and one new crossing guard location, with a school stop added on 153rd Street north of Walnut Meadows Drive.
142nd Street and Meredith Drive Traffic Signal
Two damaged traffic signals — one cracked in a mast arm — will be replaced by year's end, a safety fix shared with Des Moines at a cost of about $75,000 to Urbandale.
Douglas Traffic Study Cameras
Residents have been asking about new cameras along Douglas Parkway. Council asked for a Facebook post explaining they're part of a traffic study.
147th Street Yield at North Valley Drive
Residents have asked the city to look at this new intersection since it opened in November. The council approved the first reading of an ordinance requiring northbound 147th Street traffic to yield before entering North Valley Drive.
Douglas Avenue urbanization and underground utilities
MidAmerican's proposal to relocate underground electrical for the Douglas Avenue streetscape plantings project between Patricia Drive and 111th Street was approved on the consent agenda.
New DART Park and Ride at City Hall
With DART's network overhaul taking effect June 14, the old park and rides lose service — so the city struck a five-year deal to put six reserved spots on the City Hall campus, with signs and purple-marked stalls. Route 4 becomes a major cross-town route connecting riders downtown.
DART Route 4 crosstown service and transit governance
Councilmember Carberry Montgomery announced a May 29 tour of the new crosstown Route 4 focused on affordable housing and jobs; DART's new CEO announcement is expected soon.
Sinkhole repair traffic damaging city trail
Crews repairing the private-property sinkhole are using the city trail as their only access, chewing up the trail and creating traffic conflicts where they exit onto Colby Woods Drive near Hickman. Staff will look into trail protection and restoration responsibility.
DART leadership transition
DART's chief executive Amanda resigned; the board is posting the job this week hoping to hire an internal replacement by her May 9 departure. The ReImagine DART rollout is far enough along that the transition shouldn't derail it.
Meadow Drive asphalt overlay
Meadow Drive from 142nd Street half a mile west gets a fresh asphalt surface this year through a joint project with Grimes, who led the bidding. Urbandale pays about $450,000 of the $1.49 million total.
Douglas Avenue preservation project
Douglas Avenue from 111th to 121st gets full- and partial-depth patching plus an asphalt overlay for about $399,000, with night-only closures and detours via Hickman and 128th.
Potential closure of railroad line to Grimes
The railroad wants to abandon its 12-mile line through Urbandale and five other cities. The council backed designating the Iowa Natural Heritage Foundation to pursue railbanking — potentially opening a future trail corridor and freeing land near the police station site.
142nd Street paving joint project with Grimes
A $5.56 million reconstruction of 142nd Street, shared with Grimes, was awarded with Urbandale's share about $5.2 million — but the street will be closed most of the construction season. Lower bids dropped property owner assessments and eliminated prior assessment deficiencies.
2026 Street Preservation and Patching Program
Four bid awards fund patching across hundreds of locations — 101st Street/Dennis Drive and two phases of the annual patch program — with bids coming in 22–31% under estimates. Expect temporary lane closures and short road closures through the summer.