JS

Jeff Sorensen

Supervisor, District 52023-01-01 to 2027-01-01 (month-level start: January 2023 for a four-year term ending January 2027, Iowa Code §331.201[4] text read [four-year term]; month-level end: January 2027, successor seated in January 2027 after the November 2026 general election, county Board of Supervisors page 'Term Expires: 2026')

No biography on file yet.

At a glance

News mentions
0

Term ending Jan 1, 2027.

Voice

Meetings spoken in
17
Total speaking time
56:21
Avg per meeting
3:19
Segments
847

Want every word Sorensen has said?

The OpenCity MCP for Claude.ai answers questions like “what has Sorensen said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (20)(Roads)

high→Feb 2026[25]

Secondary roads project updates

The truck purchase costs $332,394, about a 3% price increase over prior models.

high↓Mar 2026[16]

Highway G28 detour complaints on 231st Street

The contract will cost the county about $1.98 million.

high↑Oct 2026[15]

Highway 92 bridge maintenance closure

A 40% cut-off of GPC's daily corn shipments and disruption for 500 cross-river commuters would hit local businesses hard.

medium↓Jan 2026[13]

Secondary roads projects — Stuart Road and seal coating

Contract amount not stated in the record; the contract was awarded at a prior meeting following an informal letting.

medium↑Jul 2026[12]

Mad Creek culvert replacement on G14

Federal bridge funds will cover the work through the DOT, so county taxpayers won't be directly billed for the construction, though the DOT letting timing could affect costs.

high↑Nov 2026[10]

Mississippi River bridge maintenance project

Reduced shutdown duration lessens economic losses for grain companies, employers, and farmers.

high↓Apr 2026[6]

$1.45 million transfer to secondary roads

$1.14 million moved into the county's road maintenance fund.

medium↓Jan 2026[6]

Secondary roads progress

Construction expenses are down with Stewart Road removed; engineering services are up due to stream bed credit requirements.

high↓Sep 2026[5]

F58 bridge replacement and paving to Cedar County line

About $3.5 million in federal STP funds plus roughly $1.5 million in local farm-to-market dollars for the paving, with federal bridge funds covering the bridge.

low↓Aug 2026[2]

New Traffic Control Technician position

The new Grade 2 position carries higher pay than the Grade 1 position it replaces.

low↓Jul 2026[2]

Potential vacation of 190th Street level B road

Could save the county ongoing maintenance costs on a road that quickly deteriorates after every repair.

low↓Jul 2026[2]

River Bend Transit bus facility construction

low↓Jun 2026[2]

Resident complaints — sewer, roads, right-of-way trees

medium↓Jun 2026[2]

Flooding on northern county gravel roads

No damage estimate yet — road crews expect to blade roads back into shape once water drops.

high↓Jun 2026[2]

New 60 mph rural speed limit

Costs for sign replacement and a full review of road markings and signage are not yet quantified.

high↓Aug 2026[2]

Moscow railroad crossing safety upgrade

The crossing upgrade is 100% federally funded; a future pavement grant could cost the county roughly a 20% local match.

high↓Jan 2026[1]

F70 bridge replacement over Little Mosquito Creek

Already-awarded contract; no new county action taken at this meeting.

medium↓Mar 2026[1]

F-58 walnut tree removal and paving project

Removal is far cheaper than the 900–1,500 feet of steel guardrail the alternative would require.

high↓Mar 2026[1]

FY 2027 Secondary Roads Five Year Program

No dollar figure was given in discussion; the program is funded through a mix of federal bridge funds, STP funds, and local money — Noble Avenue work is local-funds only.

high↓Mar 2026[1]

Winter storm conditions on county secondary roads