Civic Issues
Topics getting the most attention in Des Moines County public meetings, ranked by how frequently they are discussed.
8 issues in roads with medium priority
Mediapolis Road Crack Sealing and Rural Intersection Lighting
Crack sealing started on Mediapolis Road — one lane with minimal delays, not a full closure as some believed. Weather may drag the project into next week.
Level C Road Dispute on 70th Avenue
A gated dirt road north of Highway 99 has become a landowner feud: some neighbors want it permanently closed, the Timberghost hunting operation opposes closure and even wants it reopened, and an easement dispute is simmering between owners. The engineer will set up a work session where all landowners can state their case.
Bridge PG-16 preliminary design
The county is pre-designing a second Beaverdale-area bridge (~$27,750) so it's ready if a federal grant lands, given unreliable federal bridge funding.
Bridge F-10 Engineering Contract
The Board approved the engineering services contract for the Bridge F-10 replacement project, moving the bridge work forward.
Four-way stop coming to South Gear and West Avenue
Burlington is converting the South Gear/West Avenue intersection south of the hospital from a three-way to a four-way stop. Drivers who currently cruise through will now have to stop — expect an adjustment period and flagged stop signs.
Concrete road blow-ups from extreme heat
The engineer urged drivers to watch speed signs as counties set different limits under the new 60 mph state code, and warned that 90-degree heat is blowing up old concrete pavements — Pleasant Grove Road and Beaver Dale Road both buckled recently. Report any road bulges you spot.
Road maintenance concerns on 118th Street/94th Avenue
A resident complained that highway construction two years ago replaced his private road's millings with gravel, causing ongoing patching, flat tires, and gravel on the highway. He was directed to the County Engineer and assessor.
Pavement Markings and Gravel Road Rock Program
The county bids dust control annually ($135,121.91) and a rock program every other year ($302,175) to guarantee every gravel road gets full-length rock. Both come from the rural services fund — and the engineer warned state property tax cuts could threaten them.