Eagle Point Lodge structural repairs
Summary
Change Order #1 for the 89-year-old lodge came in about $41,000 over the original bid, covering a deteriorating main beam and flooring work. A future change order for eight steel support posts (roughly $15,000-$20,000) is likely; the project should finish by mid-March.
At a glance
- Total mentions
- 1
- Last 30 days
- 0
Last discussed Jan 27, 2026.
Impact analysis
About $41,243 over the original bid, with possible further costs for steel posts; funding to be found within existing resources.
Lodge users and renters, plus long-term preservation of the building.
Possibly other city projects if funding must be shifted.