Temporary closure of Farmers Beach Road (Cedar Ave)
Cedar Avenue near Clear Lake is closed for about two days while the Sanitary District replaces lift station pumps, requiring tanker trucks and a crane on the dead-end road.
Secondary Roads truck transmission failure and denied warranty
A county truck is out of service because its transmission failed and the warranty claim was denied. The county is now checking whether bearing debris got into the transmission, which could affect the repair approach.
Swallow Avenue vacation follow-up
Martin Marietta asked the county to vacate a roughly 5,000-foot stretch of Swallow Avenue it says can't be used for further quarry expansion, and the engineer calls it redundant to the road system. Adjacent landowners are on board. A public hearing is set for September 21.
Highway 122 & South Taft Avenue intersection improvements
Mason City is chasing grant dollars to remake one of its busier intersections for safer, smoother travel. The county's unanimous support strengthens the city's applications at no cost to county taxpayers.
Railroad crossing replacements (50/50 agreements)
Two long-problematic rail crossings aren't in the state's improvement program, so the engineer wants to split full rebuild costs 50/50 with the railroad — roughly $100,000 and $80,000 from the county, funded from cash carryover.
Yield sign conversion at Yarrow Avenue & 150th Street
A constituent spent a year pushing to fix a confusing double-stop intersection where two gravel roads angle into a paved road. The inner stop sign becomes a yield sign, matching how similar intersections are handled countywide.
Secondary Roads update and equipment repairs
Road crews shift to four 10-hour days starting this week, with chloride work, shoulder cutting, ditch cleaning, and crossroad tube repairs underway; the Rockwell building project is nearing a letting date.
Work-zone safety funding application
The county is applying for state safety funds to buy a truck-mounted attenuator — a crash cushion trailer that protects road crews from drivers who rear-end work zones. It lists at nearly $80,000, which would be hard to buy outright.
Rockwell utilities and paving projects
Sewer and water extensions in Rockwell are underway, but soil remediation and paving likely won't wrap until next spring. A roughly 6-mile paving project should start around July 13.
Beaverdam Creek bridge replacement on 150th Street
A bridge on 150th Street just east of Lark Avenue will be replaced using federal-aid funding — one of the few county bridges that qualifies. The agreement locks in federal money and the rules that come with it.
Thrush Avenue federal-aid project agreement
A corrected federal funding agreement was signed so the Thrush Avenue cold-in-place recycling and resurfacing project can move forward to letting.
Shared bridge project with Clear Lake (F 6)
The county and Clear Lake are setting a letting date for a shared bridge project on the north side of the lake, with right-of-way agreements moving forward.
Winter road operations and salt supply
The engineer reported two trucks down with wiring and radiator problems, grading work on roads, and the county restocking 800 tons of raw salt to stay prepared after supply shortages hit distributors in recent storms.
Street Name Sign Replacement Program